IMGP0387.JPG
|
Approaching the burned-out transformer vault (to right of loading dock door)
|
|
IMGP0388.JPG
|
Chief Inspector Vasquenza and Inspector Eichner
|
|
IMGP0389.JPG
|
Burned-out vault; Kirk Blair from Mode1 (in purple)
|
|
IMGP0390.JPG
|
Fire damage next to the vault
|
|
IMGP0391.JPG
|
Part of the work area, seen from the building
|
|
IMGP0398.JPG
|
The Bulkeley MDF - in the dark, but undamaged
|
|
IMGP0399.JPG
|
Two new transformers set on pads on the sidewalk
|
|
IMGP0400.JPG
|
New conduit for our fiber, plus the two new building electrical feeders (at bottom)
|
|
IMGP0401.JPG
|
Bulkeley's better side
|
|
IMGP0402.JPG
|
Ditto
|
|
IMGP0403.JPG
|
Splicing the replacement fiber cable
|
|
IMGP0406.JPG
|
The splicer is working inside the van; the 'figure eight' will be pulled underground into the building
|
|
IMGP0414.JPG
|
Bulkeley's parking lot filled with CL&P trucks, and other contractors and staff
|
|
IMGP0415.JPG
|
Temporary offic trailers on the scene
|
|
IMGP0416.JPG
|
The Colt Dome over the parking lot
|